LogisVert: plan your project before choosing a heat pump
The checks that matter: the applicable program, exact equipment, supporting documents and budget. A clear approach without assuming an incentive will be approved.
Read articleCoherent procurement starts before model selection. Clarify the decisions shared by the developer, design professionals and suppliers.

Getting an early price is useful. Making sure everyone prices the same scope is more useful. We recommend a shared brief for the developer, design professionals and suppliers: dwelling count, unit types, intended uses, finish level and target delivery dates.
Ask professionals to identify equipment locations, routes, connections, service access and acoustic constraints. Tie the list to a specific drawing revision. When a plan changes, the team should be able to trace the effect on quantities and on products already selected. That record gives procurement a concrete basis for seeking confirmation.
LogisVert includes a construction pathway. Check it for a new project before adopting assumptions from a residential renovation. Read the source
We recommend a handover file containing the models actually installed, manuals, applicable warranties and service contacts. Name the person who receives it and the person who checks it against delivered equipment. For an initial phase, consider agreeing on a sample or configuration review before repeating the selection throughout the project.
Begin a supply enquiry with current drawings, a requirements list and a schedule. Altrovia can then look for documented options and prepare a project-specific proposal. Prices, availability and lead times are confirmed in the quotation and should not be inferred from a general product presentation.
Sources consulted September 18, 2026.