LogisVert: plan your project before choosing a heat pump
The checks that matter: the applicable program, exact equipment, supporting documents and budget. A clear approach without assuming an incentive will be approved.
Read articleNominal capacity tells only part of the story. Sizing, cold-weather efficiency and the exact system configuration must be considered together.

ENERGY STAR emphasizes correct sizing: equipment that is too large or too small can compromise comfort and performance. Selection should start with a heating and cooling load calculation appropriate to the building. Read the source
SEER2 describes seasonal cooling efficiency; HSPF2 describes seasonal heating efficiency. COP compares heat delivered with energy consumed under specified conditions. A seasonal rating therefore does not replace operating data at a particular outdoor temperature. Read the source
Give each equipment combination its own row in the purchasing comparison. Record the conditions behind the advertised figures instead of comparing results obtained under different conditions. Ask the professional to identify missing data. An undocumented field is a question to resolve before ordering, rather than a reason to assume two systems are equivalent.
We recommend agreeing who will explain the controls, where manuals will be kept and how maintenance and service requests will be handled. In a multi-unit building, maintain a record for each system so the team can find the right model details after handover. A documented equipment choice should support both the initial purchase and the people who will operate the building.
These sources provide technical reference points. U.S. guidance does not determine Quebec incentives or regulatory requirements. Altrovia equipment specifications must be confirmed for each model.
Sources consulted September 18, 2026.
Selecting equipment or planning supply? Share your project requirements with us.
Let’s discuss your project